Formwork and Mateenbar GFRP rebar grid setup on the Beachmere shoreline before the abutment slab concrete pour.

Beachmere Boat Ramp Renewal, Australia

Key Details

Client/Contractor: MGN Civil Pty Ltd

Location: Smith Rd, Beachmere, Queensland, Australia

Date: April 2026

Project Overview

The Beachmere Boat Ramp Renewal involved the removal of an existing, rusted and cracked boat ramp and its replacement with a new precast GFRP reinforced concrete ramp system and cast-in-situ abutment. Beachmere’s boat ramp sits in a tidal, high-salinity marine environment – conditions that had already caused significant corrosion damage to the original steel-reinforced structure.

Working to a tidal programme, the project team could only place the precast ramp planks and pour the abutment during low-tide windows, adding time pressure to an already demanding coastal environment. Minimising future cracking and guaranteeing long-term durability were key requirements for the asset owner.

Why Fibreglass Rebar was Used

Mateenbar™ GFRP rebar was specified for its resistance to the chloride-induced corrosion that had degraded the original steel-reinforced ramp. The new ramp planks were precast off-site by CivilMart and trucked to Beachmere, while the abutment slab and footings were poured in-situ, reinforced with 16mm and 19mm Mateenbar™ 60.

Mateenbar™ 60 is approved by Transport and Main Roads (TMR) Queensland and utilised under their design code (MRTS271). Mateenbar™ is listed as the first supplier on TMR’s approved supplier portal for GFRP boat ramp reinforcement – a requirement for TMR-managed boat ramp projects across Queensland.

Key Benefits of GFRP Rebar:

Corrosion-resistance: Unaffected by the salty, tidal conditions at the site

Extended Asset Lifespan: 100-year design life, reducing whole-of-life maintenance costs

Lightweight: Easier handling of precast planks and on-site placement

TMR-Approved: Mateenbar™ 60 is approved for Queensland transport infrastructure 

Reduced Cracking Risk: Supports long-term structural performance in a harsh marine environment 

Design & Construction with GFRP Rebar

The ramp combined off-site precasting with in-situ construction – the GFRP reinforced concrete ramp planks were cast by CivilMart before transport to site, while the abutment slab and footings were reinforced with Mateenbar™ 60 and poured in-situ. Working within tidal low-water windows added scheduling complexity, and the corrosion resistance of Mateenbar™ meant the structure could be built to perform reliably in a permanently salty, tidal environment without the risk of long-term steel degradation.

Feedback from MGN Civil

MGN Civil engaged Pultron to supply the GFRP bars required for the approach slab construction at the Beachmere Boat Ramp. The team was very happy with the quality of the product supplied, noting that responsive support in arranging additional bars from available stock, when required, was greatly appreciated. With Pultron’s new warehouse now established locally at Geebung, MGN Civil expects even more efficient supply and service on future Queensland projects.

Built for Queensland’s Toughest Coastal Conditions

The Beachmere Boat Ramp Renewal reflects a growing shift among Queensland asset owners and contractors toward GFRP reinforcement for concrete infrastructure in coastal and marine environments. With Mateenbar™ 60 approved by TMR and a 100-year design life, the project delivers a corrosion-free, low-maintenance solution built to withstand tidal, high-salinity conditions for the long term.